Demolition of the multi-story parking lot (backfilling)
Reduce maintenance costs! We offer a complete package from the dismantling of multi-story parking lots to the backfilling and conversion into flat parking lots.
Our company has extensive experience in the dismantling and removal of multi-story parking garages (mechanical parking systems). If the environment allows for a grapple truck (clamp or Hiab), significant reductions in the construction period compared to typical timelines are possible. We offer a one-stop service that includes backfilling and leveling work. Since the majority of the debris generated from dismantling is metal, this area easily creates synergies with our main business of metal recycling. 【Features】 ■ Speeding up the construction period ■ Reducing transportation costs ■ Dismantling + on-site horizontal movement + transportation, achieving cost savings with one vehicle serving three roles ■ 10 pits, construction period: 2 days, about half of the average construction period *For more details, please refer to the PDF document or feel free to contact us.
- 企業:ミヤザキ・メタルサービス
- 価格:Other
